SmartStep™ = SMST | |
|
|
Battery Back Up = BBEMC | |
| |
Plenum Listing = CCEA | |
|
|
Installation/Maintenance Safety = IMS |
|
|
|
Custom Fixtures = CF | |
|
|
Turnkey Installations = TI | |
| |
Specifiers Mock Ups = SMU | |
|
TI – 120V / 227V OPERATION
National Cathode Corp. is specified for our reliability, reputation and for one or many of our salient features. Sometimes the electrical contractor is not familiar with our product and does not bid it, tries to substitute or value engineers our product. National Cathode Corp technical team is ready to explain the ease in which our product can be installed. For our customer’s convenience, National Cathode Corp. has assembled a team of extremely talented specialized installers who have successfully installed over 65,000 linear feet of cold cathode systems components without issue, on time and without complaint
“TI”
Specification for TURN KEY INSTALLAIONS
Manufacturer: | To supply certified factory technician at site for a complete survey, field dimensions, pattern making (when required), secondary routing, lampholder mounting, lamp insertion and temporary systems ignition prior the electrical contractor making the final electrical connection to the power supplies. |
Representative: | To supply all contact information of the sites electrical contractor. |
Information: | Contact National Cathode Corp. direct for specification inclusions |